HDD IN DIFFICULT ALLUVIAL SOIL

Client: IMET Spa – Italy

Year: 2007

What I did: detailed design and work direction of the installation of a DN450 HDPE drainage pipe along a curved drilling path with sharp bending radius in alluvial soil with polygenic boulders, for a total length of 180 m (590 ft) – Selva di Val Gardena, Italy.

HDD IN DIFFICULT ALLUVIAL SOIL

contact-info2